The Trans-alaska Pipeline

After the discovery of oil in the desolate area ofcompanies could finally commence construction on
Prudhoe Bay, Alaska in 1968, the need for athe haul road in 1974. Dalton Highway is the
system of transporting oil from the regionpresent day road that evolved from the original
became apparent. Upon considering severalpipeline haul road, on which construction began on
options, involved oil companies settled onApril 29, 1974. After five months of construction,
constructing an elaborate pipeline system whichthe haul road was completed in September, and
would transport oil from Prudhoe Bay in the Norththus construction on the Trans-Alaska Pipeline
Slope to the Port of Valdez, where it could bebegan the following March.
picked up by oil tankers for shipment to the lowerIn depth evaluations of the environment during
48 states. The project was to begin with thethe planning stages led to design modifications
construction of a haul road to carry supplies andfrom the originally planned underground pipeline.
workers to the remote areas through which theThe threat of structural support issues in
pipeline would transport oil over miles ofearthquake prone areas and areas with unstable
mountains, rivers and streams.permafrost led to a design with more than half of
While the pipeline system was determined to bethe length of the pipeline being constructed above
the most economical option that would meet theground. Heat from underground pipeline can thaw
logistical needs of the oil companies, it was notthe permafrost, and thus underground pipeline
met without opposition from native villagers andconstruction is limited to areas with stable, solid
environmental activists. Natives filed a law suit torock.
prevent the haul road from being built throughIn just over two years, the approximately 800
their land, and several environmental groups filedmile pipeline was completed between Alaska’s
suit based on claims that construction of theNorth Slope and the Port of Valdez. Juneau
pipeline would violate the National Environmentalbecame the first vessel to pick up crude oil from
Policy Act (NEPA) as well as the Mineral Leasingthe Port of Valdez that had made the journey
Act of 1920 (MLA). The project was delayed forfrom Alaska’s North Slope. Today, the
several years due to lawsuits and red tape inAlyeska Pipeline Service Company, which is a
obtaining federal and state right of way and all ofconglomerate of several pipeline companies,
the required permits for the project.operates and maintains the pipeline and offers
Having overcome years of obstacles, theeducational tours to the public.